Closed MSW landfill ”Kuchino“: landfill gas

Technical specifications

  • Landfill gas collection and treatment system
    • Gas treatment
      • Booster station
        • Сapacity: 5,000 m³/h
      • High temperature flare
        • Capacity: 25 MW

Description

Landfill gas collection and treatment system>Gas treatment>Booster station(Сapacity 5,000 m³/h), High temperature flare(Capacity 25 MW).

Location